2017
Project : Formation damage
TYPE OF JOB: stimulation
PRODUCT: ScaleCLEN 200 + PFA 200
Deployment Method: Bullheading
Post Job Result: Before treatment: 839bop, After treatment: 1,141bop
Workboat Assisted: NO
Location: East Malaysia
Project : Sand issues
TYPE OF JOB: Sand Cleanout & Stimulation
PRODUCT: ScaleCLEN 200 + PFA 200
Deployment Method: CTU
Post Job Result: Production reduces over time, with increased WC
Workboat Assisted: NO
Location: East Malaysia
Project : Post TTGP acidizing to treat possible formation damage around GP area
TYPE OF JOB: Acidizing
PRODUCT: Sandstone mud acid
Deployment Method: Bullheading
Post Job Result: Based on WT, instantaneous oil gain is 591.25 bopd. WC reduced from 55% to 26%
Workboat Assisted: YES
Location: East Malaysia
Project : Suspected fines migration & plugging TTSS
TYPE OF JOB: Screen Wash
PRODUCT: TFW + FCA-I
Deployment Method: Bullheading
Post Job Result: Porduction maintains with WC ranging 82% – 88%
Workboat Assisted: NO
Location: East Malaysia
Project : Suspected fines migration & plugging TTSS
TYPE OF JOB: Screen Wash
PRODUCT: TFW + FCA-I
Deployment Method: Bullheading
Post Job Result: Increase in liquid rate per day, however oil production remains. WC increases from 89% to 94%
Workboat Assisted: NO
Location: East Malaysia
Project : Suspected fines migration & plugging TTSS
TYPE OF JOB: Screen Wash
PRODUCT: TFW + FCA-I
Deployment Method: Bullheading
Post Job Result: No significant change in production. WC reduces from 70% to 59% after 3 mths of entry
Workboat Assisted: NO
Location: East Malaysia
Project : High skin suspected due to fines migration
TYPE OF JOB: Well Stimulation
PRODUCT: Sandstone mud acid
Deployment Method: Bullheading
Post Job Result: Before the treatment,total liquid rate 595 blpd, Oil Rate 473 bopd with 21% WC, FTHP=140psi. After Treatment, Increment of Total liquid rate 1,014blpd, Oil rate 684 bopd with 33% WC, FTHP=250psi
Workboat Assisted: YES
Location: East Malaysia
Project : fines migration, skin damages after drilling & completion and wax issue
TYPE OF JOB: Well Stimulation
PRODUCT: Sandstone mud acid
Deployment Method: Bullheading
Post Job Result: Before treatment total liquid rate 353 blpd, Oil rate 287 bopd with 18% WC, FTHP = 100psi. After treatment, total liquid rate drop 335 blpd, Oil rate 267 bopd with 20% WC, FTHP = 150psi
Workboat Assisted: YES
Location: East Malaysia
Project : Fines migration
TYPE OF JOB: Well Stimulation
PRODUCT: Sandstone mud acid
Deployment Method: Bullheading
Post Job Result: Before treatment, total liquid rate 69 blpd, Oil Rate 4 bopd with 94% WC, FTHP=100psi. After treatment, Increment of Total liquid rate 1,920blpd, Oil rate 358 bopd with 81% WC, FTHP=170psi
Workboat Assisted: YES
Location: East Malaysia
Project : Fines migration
TYPE OF JOB: Well Stimulation
PRODUCT: Sandstone mud acid
Deployment Method: Bullheading
Post Job Result: Before treatment the production 419 blpd with 40% watercut. After treatment, production at 754 blpd with 33% watercut
Workboat Assisted: YES
Location: East Malaysia
Project : Fines migration
TYPE OF JOB: Well Stimulation
PRODUCT: Sandstone mud acid
Deployment Method: Bullheading
Post Job Result: Before treatment, 656blpd with 67% watercut. After treatment, 236 blpd with 22% watercut
Workboat Assisted: YES
Location: East Malaysia
Project : Fines migration,wax and heavy hydrocarbon issue
TYPE OF JOB: Well Stimulation
PRODUCT: Sandstone mud acid
Deployment Method: Bullheading
Post Job Result: Before treatment, Total liquid rate 968 blpd, Oil Rate 496 bopd with 49% WC, FTHP=200psi. After treatment, Increment of Total liquid rate 1,443blpd, Oil rate 712 bopd with 51% WC, FTHP=200psi
Workboat Assisted: YES
Location: East Malaysia
Project : Fines migration
TYPE OF JOB: Well Stimulation
PRODUCT: Sandstone mud acid
Deployment Method: Bullheading
Post Job Result: Before treatment, total liquid rate 328 blpd, Oil Rate 180 bopd with 45% WC, FTHP=172psi. Before treatment, Increment of Total liquid rate 3413blpd, Oil rate 1310 bopd with 62% WC, FTHP=305psi
Workboat Assisted: YES
Location: East Malaysia
Project : high SAP
TYPE OF JOB: Packer leak REctification and well kill
PRODUCT: StimNAS-G
Deployment Method: Bullheading
Post Job Result: only lubricate tubing and casing was done for this well and managed to reduce the pressure as per plan
Workboat Assisted: YES
Location: East Malaysia
Project : Sand issues
TYPE OF JOB: Sand Cleanout & FSA Treatment
PRODUCT: EasySweep & FCA-I
Deployment Method: CTU
Post Job Result: WT unable post job pending TTGP installation
Workboat Assisted: NO
Location: East Malaysia
Project : Fines migration
TYPE OF JOB: Well Stimulation
PRODUCT: Sandstone mud acid
Deployment Method: Bullheading
Post Job Result: Before treatment, Total liquid rate 712 blpd, 42% WC. After treatment no incremental gain
Workboat Assisted: YES
Location: East Malaysia
Project : Fines migration
TYPE OF JOB: Well Stimulation
PRODUCT: Sandstone mud acid
Deployment Method: Bullheading
Post Job Result: Total liquid rate 434 blpd, Oil rate 234 bopd with 46% WC before treatment and no incremental gain
after treatment
Workboat Assisted: YES
Location: East Malaysia