2013

2013

Project : Well suspected to have skin issue arising from possible formation damage.

TYPE OF JOB: Well stimulation
PRODUCT: ScaleCLEN 200 + PFA 200
Deployment Method: Bullheading
Post Job Result: Production at 5.5 bpd with 0% WC. After treatment, well flowing up to 422 bpd with 58% WC
Workboat Assisted: yes
Location: East Malaysia

Project : Well suspected to have skin issue arising from possible formation damage.

TYPE OF JOB: Well stimulation
PRODUCT: ScaleCLEN 200 + PFA 200
Deployment Method: Bullheading
Post Job Result: NO INFO. NEED TO GATHER THE INFO
Workboat Assisted: yes
Location: East Malaysia

Project : Well suspected to have skin issue arising from possible formation damage.

TYPE OF JOB: Well stimulation
PRODUCT: SANDSTONE MUD ACID
Deployment Method: Bullheading
Post Job Result: Production at 302 bLpd with 36% WC. After treatment, well flowing up to 934 bLpd with 0% WC
Workboat Assisted: yes
Location: East Malaysia

Project : High water production at sand TM 3.2. Plan to abandon and add perf at zone RM 3.1. Challenge

  1. Long rat hole (2000 ft)  
  2. small interval between old and new perf. (30 ft)
  3. Well in lose condition (>7bpm) High water production at sand TM 3.2. Plan to abandon and add perf at zone RM 3.1. Challenge
  1. Long rat hole (2000 ft)  
  2. small interval between old and new perf. (30 ft)
  3. Well in lose condition (>7bpm)

TYPE OF JOB: ZONE SHUT OFF
PRODUCT: PLUG GEL N-1
Deployment Method: Bullheading
Post Job Result: SUCCESSFULLY HYDROTEST AT SURFACE 350 PSI AT 15 MINUTES BEFORE PROCEEDING WITH ADD PERF. WELL PRODUCING FOR 1000 BBLS/D WITH 5% WC FOR 18 MONTHS
Workboat Assisted: yes
Location: East Malaysia

Project : Near wellbore formation damage due to high volume of LCM been pumped during WO. Production at 250 bbls/d with 15% watercut

TYPE OF JOB: Well stimulation
PRODUCT: ScaleCLEN 200 + PFA 200
Deployment Method: Bullheading
Post Job Result: Well flowing up to 800 bbls/d with 0% watercut
Workboat Assisted: NO RECORD
Location: East Malaysia

Project : Near wellbore damage due to skin and filter cake scale up. Production at 115 BOPD with 43% WC

TYPE OF JOB: Well stimulation
PRODUCT: Sandstone mud acid
Deployment Method: Bullheading
Post Job Result: Well flowing at 375 BOPD w/ 72% WC
Workboat Assisted: NO RECORD
Location: East Malaysia