Panorama Oil & Gas Sdn Bhd Business Suite 19A-28-1 UOA Centre No 19, Jalan Pinang 50450 Kuala Lumpur Malaysia

2013
Project : Well suspected to have skin issue arising from possible formation damage.
TYPE OF JOB: Well stimulation
PRODUCT: ScaleCLEN 200 + PFA 200
Deployment Method: Bullheading
Post Job Result: Production at 5.5 bpd with 0% WC. After treatment, well flowing up to 422 bpd with 58% WC
Workboat Assisted: yes
Location: East Malaysia
Project : Well suspected to have skin issue arising from possible formation damage.
TYPE OF JOB: Well stimulation
PRODUCT: ScaleCLEN 200 + PFA 200
Deployment Method: Bullheading
Post Job Result: NO INFO. NEED TO GATHER THE INFO
Workboat Assisted: yes
Location: East Malaysia
Project : Well suspected to have skin issue arising from possible formation damage.
TYPE OF JOB: Well stimulation
PRODUCT: SANDSTONE MUD ACID
Deployment Method: Bullheading
Post Job Result: Production at 302 bLpd with 36% WC. After treatment, well flowing up to 934 bLpd with 0% WC
Workboat Assisted: yes
Location: East Malaysia
Project : High water production at sand TM 3.2. Plan to abandon and add perf at zone RM 3.1. Challenge
- Long rat hole (2000 ft)
- small interval between old and new perf. (30 ft)
- Well in lose condition (>7bpm) High water production at sand TM 3.2. Plan to abandon and add perf at zone RM 3.1. Challenge
- Long rat hole (2000 ft)
- small interval between old and new perf. (30 ft)
- Well in lose condition (>7bpm)
TYPE OF JOB: ZONE SHUT OFF
PRODUCT: PLUG GEL N-1
Deployment Method: Bullheading
Post Job Result: SUCCESSFULLY HYDROTEST AT SURFACE 350 PSI AT 15 MINUTES BEFORE PROCEEDING WITH ADD PERF. WELL PRODUCING FOR 1000 BBLS/D WITH 5% WC FOR 18 MONTHS
Workboat Assisted: yes
Location: East Malaysia
Project : Near wellbore formation damage due to high volume of LCM been pumped during WO. Production at 250 bbls/d with 15% watercut
TYPE OF JOB: Well stimulation
PRODUCT: ScaleCLEN 200 + PFA 200
Deployment Method: Bullheading
Post Job Result: Well flowing up to 800 bbls/d with 0% watercut
Workboat Assisted: NO RECORD
Location: East Malaysia
Project : Near wellbore damage due to skin and filter cake scale up. Production at 115 BOPD with 43% WC
TYPE OF JOB: Well stimulation
PRODUCT: Sandstone mud acid
Deployment Method: Bullheading
Post Job Result: Well flowing at 375 BOPD w/ 72% WC
Workboat Assisted: NO RECORD
Location: East Malaysia